Установка системы контроля дноуглубления на земснаряд Seaford

Фон intro

Dredging process automatization for Seaford Hopper Dredger

Efficient dredging

  • slide
    slide
  • slide
    slide
  • slide
    slide
  • slide
    slide
  • slide
    slide
  • slide
    slide
  • slide
    slide

Automated Dredging System (ADS) installation at TSHD Seaford included:

1. Technological visit to optimize the ADS configuration

2. Principal diagram engineering design and customer approval

3. Obsolete system demounting

4. Delivery and installation kit:

  • 2 draft sensors
  • trunnion depth sensor

  • atmospheric pressure sensor

  • 2 hopper sections horizontal moving sensors

  • 2 hopper sections vertical moving sensors

  • roll/pitch sensor

  • pressure sensor in the line after the soil pump

  • vacuum sensor in the line to the soil pump

  • interface converters block

  • graphic station with Teledyne PDS V300 TSHD monitoring software

  • dual-antenna GNSS receiver with precise heading

5. Sensors dimensional survey

6. PDS project creation, including the vessel 3D-model

7. ADS start-up and calibration

8. Sea trials at the dredging area



Similar projects

Яндекс.Метрика